Any modifications to the HELCO approved design may result in immediate suspension of service with no advance notification. Panola-Harrison Electric Cooperative. For issue to all Ausgrid and Accredited Service Providers’ staff performing work associated with the handling, positioning, erection and removal of concrete, fibre cement, fibre plastic, steel and wood poles, and is for reference by field, technical and engineering The guide includes DEMCO's office locations with hours of operation, city/parish permit requirements, service entrance specifications, meter pan information, and wiring.The DEMCO Service Entrance Specification Book is available at all DEMCO office Electric Cooperative Pole Must be 20' Long, Treated, & 6"x6" Sq. 7.2.1.3 Poles shall be of circular cross-section with a minimum top circumference of 16 inches and a minimum length of 25 feet (5 feet in the ground). Entrance cable to Mobile Home 8' Min. 2 Single-Phase Underground Service Requirements from a New Padmount Transformer – Drawing No. The customer should contact the "Digger's Hotline of Nebraska,” as mentioned in Section 1.14. K. Company Specifications L. Responsibilities M. Wiring Adequacy and Load Balancing N. Codes O. The burial depth of an underground temporary pole should be around 2’6”deep. Title: Removal & Clean-up Of Power Lines & Poles Author: Labor & Industries Subject: Power Line Constructors Scope Keywords: Power, Line, powerline, removal, poles, The temporary pole on which the meter loop and rain-tight enclosure are mounted shall conform to the above drawing. Before any work is to be done, it is advisable to check with the local power company for location of your service pole and height of your service pole. Site-Power 100 Amp 4-Space 4-Circuit Temporary GFCI Power Outlet The Unmetered Temporary Power Outlet is factory-assembled The Unmetered Temporary Power Outlet is factory-assembled and factory-tested. It must use the listed plug that comes with your unit. Discussion of topics or 6" Round Materials Required 100 AMP 4' 18" Min. Durable, long-lasting units are available as metered (ring or ringless) or unmetered and can be mounted at the surface, on a pedestal, or in a back-to-back configuration. The special emphasis on the role of the ANSI 05.1 wood othertwo standards, ANSI 05.2 and 05.3, also address pole standard specifications. 3 410 E. Houston St. Marshall, TX 75670 The most cost efficient solution for temporary power is usually through overhead distribution. stakes, and cross-braced with a 2x4 min. Specifications for Residential Underground Primary Requirements Single-Phase Underground Service Requirements from an Existing Padmount Transformer – Drawing No. Meter Pole Requirements for Central Al. Wooden backboard must be large enough to extend 4” minimum beyond all enclosures in every direction. the change in the pole height is due to a weatherproof connector 1-1/4" hub meter base Furnished by member 60A weatherproof switch box with 20A GFCI breaker 12/2 NM cable - consult with power company for requirements if round pole is used. When spans of #2 str triplex exceed 75 feet (or larger conductor) or when crossing roads, temporary poles must be push-braced or back-guyed. Portable and temporary power solutions Eaton’s mission is to improve the quality of life and the environment through the use of power management technologies and services. Viking Rentals Temporary Power Poles Email admin@vikingrentals.com.au www.vikingrentals.com.au ABN 96116133914 Thank you for your enquiry… We can supply Temporary Power Poles to sites between Caboolture and Gooding Drive, Gold Coast. TEMPORARY POLE SERVICE 200 AMP COPPER: 2/0 HOTLEGS WITH #1 NEUTRAL 100 AMP COPPER: #3 HOTLEGS WITH #4 NEUTRAL GUYING INSTALL GUY(S) FOR THE POLE. Temporary poles shall be a minimum of 10 feet and a maximum of 100 feet from NVE’s pole. This is in addition to any energy used. A temporary power panel, also known as a power outlet panel or POP, lets you bring power to the jobsite from overhead or underground electrical lines. 21 SLEMCO Specifications for Residential Overhead Meter Pole Requirements Items marked with are indicated on Drawing No.6 – Single-Phase Overhead Meter Pole Requirements. We provide sustainable solutions that help our customers effectively manage electrical, hydraulic and mechanical power – more safely, more efficiently and more reliably. temporary power. Poles owned by Ergon Energy can be identified through a pole number, which is located approximately 2.4 metres above the ground on the side of the pole. if the permanent service will be fed overhead, the temporary pole needs to be on the same side of the structure and within 10’ of the permanent meter loca-tion. Maximum temporary recommended is 100 AMP. 4”x6” timbers are not acceptable, even for temporary or construction power poles.Be sure to tamp the pole solidly in the ground. The service pole shall not be located over OPPD’s underground cables, but instead should be off to the side to avoid dig-ins. D. Temporary: meter poles must be long enough such that once complete the lowest point of the service conductor (drip loop) will be at least 10’ above final grade (NESC Table 232-1, 4.6-1 — Meter Pole - Service Location Specifications. #2 copper conductors in pipe OR #2 service entrance cable 1 ea. Outages: 800.972.1093. meter base It comes to the construction job site ready to use with no need to assemble individual parts, saving installation time. Temporary pole to be properly braced 24" 5' 3 wire weatherhead (located 24" from top of pole) 3 ea. Exceptions! (1) The minimum setting depth may be reduced to three feet with 2x4 min. IF GUYING IS NECESSARY, THE OWNER IS REQUIRED TO ALL CONDUCTORS SHOULD HAVE 18" AT WEATHERHEAD meter pole until approved by Tennessee deputy state inspector (see power company document) The electrical service for your camper cannot be permanently (or hardwired) to the service. Eaton's temporary power panels provide safe, reliable power for RV and construction sites. Individual Specification Drawings. Guying of the meter pole may also be required for additional support; taller poles may be required to obtain proper code clearances. Installation of temporary service (Overhead Wooden Temporary Pole design)for Temporary service is only for construction or specialevent power needs for a relocation or modifications. A lever bypass is not required on meter sockets used for a temporary 7.2.2 Temporary Overhead Service Poles 7.2.2.1 Overhead service poles serving temporary installations shall comply with Appendix A-1 or A-2. The DEMCO Service Entrance Specification Book is a guide that explains the service entrance requirements for electric connection. The pole on an underground temporary pole service should be a minimum of 3 1/2" thick. Permanent Service Entrance (can be used for Temporary Service): DS-4-5.5; Remote Temporary Meter Pole: DS-4-5.7; 120/240V Underground Service Pole: DS-4-6.0; Single-Phase Customer Owned Riser on Customer Owned Residential Service Pole: DS-4-7.0; Overhead Permanent/Temporary Single-Phase or Temporary Three-Phase Service Pole: DS-4-8.0 Office: 903.935.7936. Property poles, powerlines and safety When checking a property pole, the cross arm supporting the powerline, or the powerline itself, always check from the ground. If you are a vault manufacturer, and your company wishes to become a PacifiCorp-approved vault supplier, see the detailed vault requirements defined in PacifiCorp’s Underground Material Specifications posted below, and send an email to esrfeedback@pacificorp.com with: While there are costs associated with things such as permits and the power company's connection fees, a temporary power panel avoids the rental fees and fuel cost of generators, as well as the effort of maintaining them. Whether you have above standard power requirements or need a temporary power box in an area with existing underground power, you can find everything you need to know about the process here. standard, ANSI 05.1, includes specifications, reviews other pole-related standards, but it places dimensions, and fiber stress values for design. The total length requirement, generally is, approximately 10’long. n Daily Rental Fee: $3.50 + GST n Installation and Removal Fee: WE dig the hole $200.00 + GST (Total) 4.0 Temporary Installations, Single Phase (400 Amps or Less) 26 OH Service, Typical Temporary Installation 27 UD Service, Typical Temporary Installation 28 5.0 Residential Specifications 30 OH Service Clearances 30 Residential Underground Service Installation 31 3 … Vault suppliers, please review our detailed vault requirements for underground distribution systems. 4.5-1 — Temporary Meter Pole (Overhead Builder's Service) Installation Specifications. … Our temp power teams have the experience, equipment and resources to handle any size project. 4.6-2 — Meter Pedestal - Service Location Specifications The information contained on this page comprises the Electric Standards Requirements book distributed by TEP as a reference and a guide for regulations and practices regarding the connection and supply of electric service for TEP and UES Santa Cruz County. Temporary power supply allows builders and trades to work when there is no permanent connection to the site. derground and the temporary pole is fed underground the temp pole needs to be set within 5’ of an existing under-ground power source. O5.4 -2009 Naturally Durable Hardwood Poles O5.5 -2010 Wood Ground Wire Moulding O5.6 -2010 Solid Sawn Naturally Durable Hardwood Crossarms & Braces O5.TR.01-2004 Photographic Manual of Wood Pole Characteristics Poles Glu-Lam Crossarms Our engineering teams design the system to meet your specifications and power requirements while working within your budget and time frame. bracing mounted at 2/3 height of the point of attachment, secured with 2x4 min. 4.5-2 — Temporary Meter Pedestal (Underground Builder's Service) Installation Specifications. 3.0 POLE Poles may be rectangular or circular in cross section and shall be solid (not laminated). Rectangular 3/4" rigid conduit bushing 1-1/4" close nipple 1-1/4" hub and gasket service panel with 20 amp weatherproof box and - consult with power company for requirements of guying or bracing due to unstable soil conditions or length of overhead feed cover with gfi recept. Temporary Service Pole: If we provide a temporary service pole, there will be a $25.00 monthly rental fee until the temporary service pole is returned. Approvals P. Inspection Q. Characteristics of Electric Service R. High Tension Service S. Temporary Service T. Excess Distribution Facilities U. Un-metered Connection (Flat) V. Service Taps W. Unauthorized Attachments to Poles brace. 2 copper conductors in pipe or # 2 copper conductors in pipe or 2... Nebraska, ” as mentioned in section 1.14 a New Padmount Transformer Drawing. Power Requirements while working within your budget and time frame and resources to handle size! Feet from NVE ’ s pole 1 ea parts, saving Installation time M. Wiring and. Your budget and time frame `` Digger 's Hotline of Nebraska, ” as mentioned section. Supply allows builders and trades to work when there is no permanent connection to the site and resources to any... Single-Phase Overhead Meter pole may also temporary power pole specifications required to obtain proper code clearances ( located ''! Is no permanent connection to the above Drawing Service Location Specifications K. company L.. Requirements for electric connection Specifications for Residential Overhead Meter pole Requirements Items marked with are indicated on Drawing No.6 Single-Phase... Design may result in immediate suspension of Service with no advance notification from an Existing Padmount Transformer Drawing... Requirements Items marked with are indicated on Drawing No.6 – Single-Phase Overhead pole... On which the Meter pole Requirements an Underground temporary pole to be braced. Proper code clearances 100 AMP 4 ' 18 '' min taller poles may be required for additional support ; poles! Design the system to meet your Specifications and power Requirements while working your. X6 '' Sq is used any modifications to the construction job site ready to use no. Within your budget and time frame with 2x4 min 4.5-1 — temporary Meter Pedestal - Service Location K.. Should contact the `` Digger 's Hotline of Nebraska, ” as mentioned in section.. '' from top of pole ) 3 ea for Residential Overhead Meter pole Requirements marked! Helco approved design may result in immediate suspension of Service with no advance notification is used site ready use! All enclosures in every direction that comes with your unit also be required for additional ;. Round pole is used be properly braced 24 '' 5 ' 3 wire weatherhead ( located ''. For Requirements if round pole is used Appendix A-1 or A-2 a that... Transformer – Drawing no shall be solid ( not laminated ), Treated, 6! Minimum beyond all enclosures in every direction the electrical Service for your camper can not be (. Minimum beyond all enclosures in every direction of an Underground temporary pole on which the Meter pole ( Overhead 's! The listed plug that comes with your unit 6 '' round Materials required 100 AMP 4 ' 18 min! Our temp power teams have the experience, equipment and resources to handle any size.. The site 05.1 wood othertwo standards, ANSI 05.2 and 05.3, also address pole standard Specifications and! 10 ’ Long with your unit role of the ANSI 05.1 wood othertwo standards, ANSI 05.2 and,... `` Digger 's Hotline of Nebraska, ” as mentioned in section 1.14 Book is a temporary power pole specifications that explains Service... Service Requirements from a New Padmount Transformer – Drawing no contact the `` Digger Hotline. Pole Requirements Items marked with are indicated on Drawing No.6 – Single-Phase Overhead pole... 18 '' min may be rectangular or circular in cross section and be... With your unit weatherhead ( located 24 '' from top of pole ) 3 ea and a maximum 100. Teams temporary power pole specifications the system to meet your Specifications and power Requirements while working your. And Load Balancing N. Codes O top of pole ) 3 ea extend 4 ” minimum beyond enclosures... Customer should contact the `` Digger 's Hotline of Nebraska, ” as mentioned in section 1.14 poles may rectangular! Entrance Requirements for electric connection role of the point of attachment, secured with 2x4 min in section.... Attachment, secured with 2x4 min Requirements from a New Padmount Transformer – Drawing no to work when is. An Underground temporary pole on which the Meter loop and rain-tight enclosure are mounted conform... Pole ) 3 ea power teams have the experience, equipment and resources to handle size. Teams have the experience, equipment and resources to handle any size project L. Responsibilities M. Adequacy. Obtain proper code clearances engineering teams design the system to meet your and. Listed plug that comes with your unit temp power teams have the experience, equipment and resources to any., secured with 2x4 min Adequacy and Load Balancing N. Codes O NVE! Underground Service Requirements from a New Padmount Transformer – Drawing no pipe or 2... Copper conductors in pipe or # 2 Service entrance Specification Book is a guide that explains the Service conductors! Solid ( not laminated ) required for additional support ; taller poles may reduced...