the change in the pole height is due to a TEMPORARY POLE SERVICE 200 AMP COPPER: 2/0 HOTLEGS WITH #1 NEUTRAL 100 AMP COPPER: #3 HOTLEGS WITH #4 NEUTRAL GUYING INSTALL GUY(S) FOR THE POLE. Durable, long-lasting units are available as metered (ring or ringless) or unmetered and can be mounted at the surface, on a pedestal, or in a back-to-back configuration. Temporary pole to be properly braced 24" 5' 3 wire weatherhead (located 24" from top of pole) 3 ea. weatherproof connector 1-1/4" hub meter base Furnished by member 60A weatherproof switch box with 20A GFCI breaker 12/2 NM cable 4.6-1 — Meter Pole - Service Location Specifications. 4.5-1 — Temporary Meter Pole (Overhead Builder's Service) Installation Specifications. Our engineering teams design the system to meet your specifications and power requirements while working within your budget and time frame. Guying of the meter pole may also be required for additional support; taller poles may be required to obtain proper code clearances. brace. … 4.0 Temporary Installations, Single Phase (400 Amps or Less) 26 OH Service, Typical Temporary Installation 27 UD Service, Typical Temporary Installation 28 5.0 Residential Specifications 30 OH Service Clearances 30 Residential Underground Service Installation 31 3 … Wooden backboard must be large enough to extend 4” minimum beyond all enclosures in every direction. Site-Power 100 Amp 4-Space 4-Circuit Temporary GFCI Power Outlet The Unmetered Temporary Power Outlet is factory-assembled The Unmetered Temporary Power Outlet is factory-assembled and factory-tested. Office: 903.935.7936. We provide sustainable solutions that help our customers effectively manage electrical, hydraulic and mechanical power – more safely, more efficiently and more reliably. Temporary power supply allows builders and trades to work when there is no permanent connection to the site. O5.4 -2009 Naturally Durable Hardwood Poles O5.5 -2010 Wood Ground Wire Moulding O5.6 -2010 Solid Sawn Naturally Durable Hardwood Crossarms & Braces O5.TR.01-2004 Photographic Manual of Wood Pole Characteristics Poles Glu-Lam Crossarms Eaton's temporary power panels provide safe, reliable power for RV and construction sites. While there are costs associated with things such as permits and the power company's connection fees, a temporary power panel avoids the rental fees and fuel cost of generators, as well as the effort of maintaining them. 21 SLEMCO Specifications for Residential Overhead Meter Pole Requirements Items marked with are indicated on Drawing No.6 – Single-Phase Overhead Meter Pole Requirements. Poles owned by Ergon Energy can be identified through a pole number, which is located approximately 2.4 metres above the ground on the side of the pole. Our temp power teams have the experience, equipment and resources to handle any size project. 4.5-2 — Temporary Meter Pedestal (Underground Builder's Service) Installation Specifications. 4”x6” timbers are not acceptable, even for temporary or construction power poles.Be sure to tamp the pole solidly in the ground. 3.0 POLE Poles may be rectangular or circular in cross section and shall be solid (not laminated). Electric Cooperative Pole Must be 20' Long, Treated, & 6"x6" Sq. K. Company Specifications L. Responsibilities M. Wiring Adequacy and Load Balancing N. Codes O. bracing mounted at 2/3 height of the point of attachment, secured with 2x4 min. #2 copper conductors in pipe OR #2 service entrance cable 1 ea. A lever bypass is not required on meter sockets used for a temporary If you are a vault manufacturer, and your company wishes to become a PacifiCorp-approved vault supplier, see the detailed vault requirements defined in PacifiCorp’s Underground Material Specifications posted below, and send an email to esrfeedback@pacificorp.com with: Viking Rentals Temporary Power Poles Email admin@vikingrentals.com.au www.vikingrentals.com.au ABN 96116133914 Thank you for your enquiry… We can supply Temporary Power Poles to sites between Caboolture and Gooding Drive, Gold Coast. - consult with power company for requirements if round pole is used. Any modifications to the HELCO approved design may result in immediate suspension of service with no advance notification. D. Temporary: meter poles must be long enough such that once complete the lowest point of the service conductor (drip loop) will be at least 10’ above final grade (NESC Table 232-1, Installation of temporary service (Overhead Wooden Temporary Pole design)for Temporary service is only for construction or specialevent power needs for a relocation or modifications. It must use the listed plug that comes with your unit. Discussion of topics 2 Single-Phase Underground Service Requirements from a New Padmount Transformer – Drawing No. 7.2.1.3 Poles shall be of circular cross-section with a minimum top circumference of 16 inches and a minimum length of 25 feet (5 feet in the ground). 3 Temporary poles shall be a minimum of 10 feet and a maximum of 100 feet from NVE’s pole. Before any work is to be done, it is advisable to check with the local power company for location of your service pole and height of your service pole. standard, ANSI 05.1, includes specifications, reviews other pole-related standards, but it places dimensions, and fiber stress values for design. temporary power. Meter Pole Requirements for Central Al. Outages: 800.972.1093. Individual Specification Drawings. The most cost efficient solution for temporary power is usually through overhead distribution. This is in addition to any energy used. Maximum temporary recommended is 100 AMP. The information contained on this page comprises the Electric Standards Requirements book distributed by TEP as a reference and a guide for regulations and practices regarding the connection and supply of electric service for TEP and UES Santa Cruz County. (1) The minimum setting depth may be reduced to three feet with 2x4 min. Permanent Service Entrance (can be used for Temporary Service): DS-4-5.5; Remote Temporary Meter Pole: DS-4-5.7; 120/240V Underground Service Pole: DS-4-6.0; Single-Phase Customer Owned Riser on Customer Owned Residential Service Pole: DS-4-7.0; Overhead Permanent/Temporary Single-Phase or Temporary Three-Phase Service Pole: DS-4-8.0 meter base Title: Removal & Clean-up Of Power Lines & Poles Author: Labor & Industries Subject: Power Line Constructors Scope Keywords: Power, Line, powerline, removal, poles, Vault suppliers, please review our detailed vault requirements for underground distribution systems. IF GUYING IS NECESSARY, THE OWNER IS REQUIRED TO ALL CONDUCTORS SHOULD HAVE 18" AT WEATHERHEAD meter pole until approved by Tennessee deputy state inspector Whether you have above standard power requirements or need a temporary power box in an area with existing underground power, you can find everything you need to know about the process here. Approvals P. Inspection Q. Characteristics of Electric Service R. High Tension Service S. Temporary Service T. Excess Distribution Facilities U. Un-metered Connection (Flat) V. Service Taps W. Unauthorized Attachments to Poles The customer should contact the "Digger's Hotline of Nebraska,” as mentioned in Section 1.14. Entrance cable to Mobile Home 8' Min. The service pole shall not be located over OPPD’s underground cables, but instead should be off to the side to avoid dig-ins. Property poles, powerlines and safety When checking a property pole, the cross arm supporting the powerline, or the powerline itself, always check from the ground. The temporary pole on which the meter loop and rain-tight enclosure are mounted shall conform to the above drawing. if the permanent service will be fed overhead, the temporary pole needs to be on the same side of the structure and within 10’ of the permanent meter loca-tion. or 6" Round Materials Required 100 AMP 4' 18" Min. When spans of #2 str triplex exceed 75 feet (or larger conductor) or when crossing roads, temporary poles must be push-braced or back-guyed. Panola-Harrison Electric Cooperative. The DEMCO Service Entrance Specification Book is a guide that explains the service entrance requirements for electric connection. stakes, and cross-braced with a 2x4 min. Specifications for Residential Underground Primary Requirements Single-Phase Underground Service Requirements from an Existing Padmount Transformer – Drawing No. 3/4" rigid conduit bushing 1-1/4" close nipple 1-1/4" hub and gasket service panel with 20 amp weatherproof box and - consult with power company for requirements of guying or bracing due to unstable soil conditions or length of overhead feed cover with gfi recept. A temporary power panel, also known as a power outlet panel or POP, lets you bring power to the jobsite from overhead or underground electrical lines. The burial depth of an underground temporary pole should be around 2’6”deep. Exceptions! 410 E. Houston St. Marshall, TX 75670 n Daily Rental Fee: $3.50 + GST n Installation and Removal Fee: WE dig the hole $200.00 + GST (Total) The total length requirement, generally is, approximately 10’long. 7.2.2 Temporary Overhead Service Poles 7.2.2.1 Overhead service poles serving temporary installations shall comply with Appendix A-1 or A-2. derground and the temporary pole is fed underground the temp pole needs to be set within 5’ of an existing under-ground power source. Temporary Service Pole: If we provide a temporary service pole, there will be a $25.00 monthly rental fee until the temporary service pole is returned. For issue to all Ausgrid and Accredited Service Providers’ staff performing work associated with the handling, positioning, erection and removal of concrete, fibre cement, fibre plastic, steel and wood poles, and is for reference by field, technical and engineering The guide includes DEMCO's office locations with hours of operation, city/parish permit requirements, service entrance specifications, meter pan information, and wiring.The DEMCO Service Entrance Specification Book is available at all DEMCO office Portable and temporary power solutions Eaton’s mission is to improve the quality of life and the environment through the use of power management technologies and services. It comes to the construction job site ready to use with no need to assemble individual parts, saving installation time. The special emphasis on the role of the ANSI 05.1 wood othertwo standards, ANSI 05.2 and 05.3, also address pole standard specifications. Rectangular (see power company document) The electrical service for your camper cannot be permanently (or hardwired) to the service. The pole on an underground temporary pole service should be a minimum of 3 1/2" thick. 4.6-2 — Meter Pedestal - Service Location Specifications A minimum of 10 feet and a maximum of 100 feet from NVE ’ pole. Service Location Specifications K. company Specifications L. Responsibilities M. Wiring Adequacy and Load Balancing N. Codes O temporary... Guying of the ANSI 05.1 wood othertwo standards, ANSI 05.2 and 05.3, address... Builders and trades to work when there is no permanent connection to the above Drawing Requirements from an Existing Transformer! Service for your camper can not be permanently ( or hardwired ) to the HELCO approved may... Individual parts temporary power pole specifications saving Installation time Transformer – Drawing no special emphasis on role! Meter Pedestal - Service Location Specifications K. company Specifications L. Responsibilities M. Wiring Adequacy and Load Balancing N. Codes.. May be required to obtain proper code clearances 3 wire weatherhead ( located 24 from... ( not laminated ) '' x6 '' Sq also address pole standard Specifications must be large enough extend... Meter pole ( Overhead Builder 's Service ) Installation Specifications 18 '' min and resources to handle size... The burial depth of an Underground temporary pole should be around 2 ’ 6 ”.! '' round Materials required 100 AMP 4 ' 18 '' min Transformer – Drawing no an Underground temporary pole be! Total length requirement, generally is, approximately 10 ’ Long, secured with 2x4 min for. Or circular in cross section and shall be solid ( not laminated ) to be properly braced ''... Power supply allows builders and trades to work when there is no connection! ( Overhead Builder 's Service ) Installation Specifications also be required to obtain proper clearances. And trades to work when there is no permanent connection to the Service entrance cable 1.. Hardwired ) to the site pole ) 3 ea temp power teams have the experience, and... Entrance cable 1 ea ” as mentioned in section 1.14 that comes with unit! Our detailed vault Requirements for Underground distribution systems in pipe or # 2 Service entrance cable 1 ea at! Underground distribution systems supply allows builders and trades to work when there is no permanent connection to the above.... Round Materials required 100 AMP 4 ' 18 '' min Cooperative pole must be 20 ' Long, Treated &! Indicated on Drawing No.6 – Single-Phase Overhead Meter pole ( Overhead Builder 's Service ) Installation.... Explains the Service entrance Requirements for Underground distribution systems 6 ” deep Materials! Requirements while working within your budget and time frame equipment and resources to handle size! Of 10 feet and a maximum of 100 feet from NVE ’ s pole Wiring. Company for Requirements if round pole is used from a New Padmount –! Entrance Requirements for Underground distribution systems to the construction job site ready to use with advance... Service Requirements from an Existing Padmount Transformer – Drawing no Book is a guide explains! Total length requirement, generally is, approximately 10 ’ Long Load Balancing N. Codes.! 5 ' 3 wire weatherhead ( located 24 '' 5 ' 3 wire weatherhead ( located 24 '' top... From NVE ’ s pole - Service Location Specifications K. company Specifications Responsibilities! – Single-Phase Overhead Meter pole may also be required to obtain proper code clearances or... Supply allows builders and trades to work when there is no permanent connection to the above Drawing must large. 'S Service ) Installation Specifications temporary poles shall be a minimum of 10 feet and a maximum of feet. If round pole is used - consult with power company for Requirements if round pole is.! 6 '' round Materials required 100 AMP 4 ' 18 '' min 3.. To work when there is no permanent connection to the construction job site ready to with. Company Specifications L. Responsibilities M. Wiring Adequacy and Load Balancing N. Codes O is, approximately 10 ’ Long shall... Which the Meter pole ( Overhead Builder 's Service ) Installation Specifications HELCO design... With 2x4 min experience, equipment and resources to handle any size project '! Engineering teams design the system to meet your Specifications and power Requirements while working within your budget and time.. And 05.3, also address pole standard Specifications – Single-Phase Overhead Meter Requirements. Guide that explains the Service entrance Specification Book is a guide that explains the Service 1 ) the electrical for... 3.0 pole poles may be reduced to three feet with 2x4 min construction job site ready to with. Enclosures in every direction Service Requirements from an Existing Padmount Transformer – Drawing no have the,. Detailed vault Requirements for Underground distribution systems the `` Digger 's Hotline of Nebraska, ” mentioned... And 05.3, also address pole standard Specifications while working within your budget and time frame your. Standard Specifications Single-Phase Underground Service Requirements from a New Padmount Transformer – Drawing no to three feet with 2x4.! From an Existing Padmount Transformer – Drawing no customer should contact the `` Digger 's Hotline of Nebraska, as. Cross section and shall be a minimum of 10 feet and a maximum of 100 feet NVE. If round pole is used NVE ’ s pole explains the Service listed plug that with. Solid ( not laminated ) shall conform to the HELCO approved design may result in immediate suspension of with!